Construction continues on the new Kaplan Center for Surgical Services at Rome Health. The concrete floor have been poured for both the 1st and 2nd floors of the center. The basement level of the center is having concrete being poured now and should be completed very soon. Stairs have been installed but are not accessible at this time. As seen in the picture above, positioning and laying piping throughout the building has started. At this time, the construction is on budget and on time. Use the link below to watch a video of these and other updates to Rome Health.